Inspection #4019
Requires DPA ReviewVessel: Exmar Flanders • Inspector: Chief Engineer J. Vancamp • Date: Aug 3, 2026
AI Detected: Surface corrosion and paint breakdown on Auxiliary Boiler #2 blowdown valve casing.
MIA — Marine Inspection Assistant
OFFICIAL VESSEL INSPECTION & AI DEFICIENCY AUDIT REPORT
REPORT #4019
Issued: Aug 3, 2026
Vessel Information
Exmar Flanders
LPG Carrier • IMO 9812346
Inspection Details
Chief Engineer J. Vancamp
Verification: DPA Approved
1. Photogrammetry & Evidence Capture
2. Verified Deficiency & Corrective Action
Deficiency Description
AI Detected: Surface corrosion and paint breakdown on Auxiliary Boiler #2 blowdown valve casing.
Required Action
Descale valve casing, perform thickness measurement, and apply marine-grade protective coating prior to next PSC inspection.
This report is signed with an immutable cryptographic hash chain. Any modification invalidates the entry in the MIA Fleet Compliance Ledger.
Inspector Sign-off
Chief Engineer / Vessel Inspector
Exmar DPA Verification
Fleet Safety & Compliance Division